UNILEVER

IN FOOD
portfolio
Investor Name:
Published Date:
1 January, 1970
Location:
Value:
Architecture:
About Project

Detail Engineering Genesis Project.

Detail Engineering Piping Packed Line Genesis Project.

Detail Engineering Installation Generation and Distribution Hot Water In Process.

Detail Engineering Modification Mixer 1 Genesis Project.

Detail Engineering Installation CIP and Piping CIP Power to Installations.

Detail Engineering SHADOW Project. Engineering Detail KING FISHER Stages I; II and III Project.

Soil Survey SHADOW & KING FISHER Project. Basic Engineering Development Center of Automatic Palletizing Project.

Detail Engineering Installation PIG’s in Piping Cleaning CIP.

Detail Engineering VELVET Project. Engineering Detail Tank Beach Stock SHADOW Project.

Detail Engineering Skid design of Valves LIALET-DIVIDIDOS Projects.

Detail Engineering of the Minor Station VELVET Project.

Detail Engineering Installation Drains Reactors MX1000, 5000, 6000, 7000.

Final Basic Engineering Lines SHADOW-SERAC Project Lay Out. Thickness Measurement and Structural Verification Tanks CAPB.

Detail Engineering Process and Packaging PELO Project.

Detail Engineering DREAN Project. Rheological Study of MP and Processed Product.

Detail Engineering Reduction Mermas Mx 2000 Project.

Engineering Detail SHADOW PACKING Project.

Detail Engineering HIPOCLORITO DE SODIO DE HC.OM Project.

Technical Advisory TAICH Project.

Detail Engineering DEOS Project.

Detail Engineering SHERMAN Project. Engineering Detail MUPY Project.

Detail Engineering MICROSHEETS project.

Detail Engineering Installation MIXER 8-MODIFICATION INST MIXER 3-4.

Detail Engineering Installation Disolutor-Brine Concentrator.

Detail Engineering Assembly and Piping CAGE Project.

Basic Engineering Relocation of Brine Tanks.

Detail Engineering Extension Ring Hot Water and Water For processes.

Detail Engineering Installation Dissolvent.

Detail Engineering and Assembly of a New Natural Gas Reduction Plant (PRGN).

Survey and Classification of ATEX Risk Areas.

Basic & Detail Engineering REWORK Project.

Engineering Update SONOLATOR.

Engineering Update MIXER 1-2-3.

Basic Engineering TROPHY AVENNE Project.

Survey and Preparation of Plans According to Work Installation of GN.

Detail Engineering Condenser Vapors Equipment Premixer 4400 (Pillow).

Stress Analysis Piping Installation CIP.

SHE Project Survey and Design of Stairs in Liquid Packaging Line.

Basic Engineering Improvement Logistics Internal Project Aerosols Plant.

Basic & Detail Engineering Installation of GN to Boilers.

Detail Engineering Installation Film Scrapers for Pasta Starch.

Detail Engineering and Supervision FLOYD Project 1 Project.

Detail Engineering and Supervision FLOYD Project 2 Project.

Detail Engineering Installation Bridge Crane of 25 Tn.

Detail Engineering and Construction Supervision Adaptation of Piping facilities Process to GMP QASTEP3.

Detail Engineering Installation for Pneumatic Starch Transport to ESM Tanks.

Conceptual Basic Engineering Installation Arsenic Removal of Puelche Aquifer.

Detail Engineering for design of new valve box for tanks and pumps of the Premix installation.

Electrical Engineering DEBOTTLENECKING 1 Project.

Detail Engineering DEBOTTLENECKING Project 2 Project. 

Detail Engineering DEBOTTLENECKING 3 Project.

Detail Engineering to Optimize Installation Cleaning CIP.

Detail Engineering Design Cluster of Valves Installation ESM and Mills.

Basic Engineering PP8CC Project .

Detail Engineering Connection Board PREMIXER.

Detail Engineering Installation UMA 4.

Detail Engineering water passage No. 3-

Detail Engineering CIP Installation to Egg Cluster.

Detail Engineering and Calculation Structure Support Cold Towers and Chiller.